favorite
favorite
hide
unhide
flag

Posted

print

Catalina 38 1979 80% rebuilt. As is sell - $15,000 (Marina Del Rey)

Catalina 38 1979 80% rebuilt. As is sell 1 thumbnailCatalina 38 1979 80% rebuilt. As is sell 2 thumbnailCatalina 38 1979 80% rebuilt. As is sell 3 thumbnailCatalina 38 1979 80% rebuilt. As is sell 4 thumbnailCatalina 38 1979 80% rebuilt. As is sell 5 thumbnailCatalina 38 1979 80% rebuilt. As is sell 6 thumbnailCatalina 38 1979 80% rebuilt. As is sell 7 thumbnailCatalina 38 1979 80% rebuilt. As is sell 8 thumbnailCatalina 38 1979 80% rebuilt. As is sell 9 thumbnailCatalina 38 1979 80% rebuilt. As is sell 10 thumbnailCatalina 38 1979 80% rebuilt. As is sell 11 thumbnailCatalina 38 1979 80% rebuilt. As is sell 12 thumbnail
boat type: sailboat
propulsion type: sail
condition: good
length overall (LOA): 38
make / manufacturer: Catalina
model name / number: 38
year manufactured: 1979
Selling my Catalina 38 1979. This boat has been dismantled and slowly put back together. Yanmar 2QM Runs great and the boat sails.

I’m a marine mechanic and own a boat repair company. I haven’t had time to finish this project boat.

I’m losing interest but it’s a nice clean boat with lots of potential. Needs a few cosmetic and project items but solid boat inside and out. I have a rebuilt M30 ready to go into the boat if that’s something you’re interested in for an additional cost. The 2QM works and does just fine.


- 12V refrigerator
- 4 new batteries
- 11ft Inflatable dinghy and 12V motor
- BBQ Grill
- AC portable Unit
- Oil heater
- Sails 70-80% good life expectancy
- like new 250 ft rode and 40ft chain
- Bottom cleaned monthly
- zinc last a long time
- Slip is Transferable with application qualification $900 per month. At current location


Projects:
- Jib needs sun cover protection stitching
- Outside rails need oil or varnish
- Water tank needs pump installed but the boat has a direct inlet for dock water, there’s no need to fill the tank for running water
- Windows have been tinted and rebeded but a few still leak…
- hard rigging is good but soft lines/ropes could be replaced
- Outside life lines need replacement
- Bimini canvas needs replacing the
- outside cushions need sawing but look newer.
- Bottom will need done 1-2 years
- No survey available but can refer if u need one


Give me a call with question
Thank you


post id: 7744283736

posted:

updated:

best of [?]

loading
reading
writing
saving
searching